Measure G Bond funding made it possible for us to work closely with the Napa Valley Unified School District and community to design and manage construction of multiple track and field projects. Construction for all sites was completed in 7 months. Project locations included Napa and Vintage High Schools, American Canyon, Redwood and Silverado Middle Schools.
- Synthetic turf soccer/football/lacrosse/rugby fields with automatic washdown systems
- 8 lane all-weather track with field events for both high schools and 6 lane all-weather track with field events for middle schools
- Accessible perimeter walkways
- Emergency and ADA access
- Spectator seating areas
- Security fencing
- Drinking fountains